Zahia Restoration

Our shipyard manages the full refit of "Zahia" (Class 40).

Re-surfacing, hull and deck painting, epoxy painting and antifouling on the bottom, toe-clips installation, mast and boom painting, chandlery cleaning and installation, manufacturing and installation of the spinnaker pole...

A long and interesting work before "Zahia" can sail again!

Arrivée Zahia

"Zahia" arrival at TYP

préparation de surface

Surfacing

 

January 2013: surface preparation on the hull (topsides and bottom), before application of the first paint layer. Application of Interprotect (epoxy primer) on the bottom.

Préparation sous-couche

Sous-couche roof zahia

sous couche cockpit zahia
Application interprotect application interprotect

March 2013: spars preparation and painting, keel and rudders delivery

peinture espars zahia quille zahia

July 2013: after several days of surfacing, "Zahia"'s hull was painted. After three layers, the result is great:

Après trois couches :

Peinture Zahia